Design and Engineering Handbook
Part Design
Tool Design
Failure Analysis
Secondary Operations
Printable Brochure

Secondary Operations: Vibration Welding


Critical Constraints
  • Vibration time
  • Hold time
  • Joint pressure
Notes
  • Limited to 2-dimensional welding
  • Provides hermetic seal, fast and clean
  • Welds large areas