|
|||||||||||||||
|
|
Field Failure Analysis: Wallner Lines
Critical Constraints
Notes
If an initial fracture site and the suspect area that is believed responsible for the initial failure, have been located then you should consider modifying the design. If the checklist has been followed and the initial fracture site has not been located, then you should contact an Eastman representative in your area for assistance. |
||||||||||||||